Fascia, letters, projecting, illuminated

What does a shop front sign cost in the UK?

Level 4 fine displaying an advertisement without consent is an offence under s.224 of the 1990 Act

Get shop sign quotes

The sign

What kind of sign?

Lighting affects price, electrical work and conservation-area consent.

  • Free, no obligation
  • Your details go to at most three sign makers
  • Takes about two minutes

Leave your email and we'll get straight back to you.

  1. We email you the questions a firm needs answered, straight away.
  2. You answer them by reply, or on this site.
  3. Up to three firms get your request.

What sets the price of a shop sign, 2026

Sign type, size, illumination and access set the price. Advertisement consent sets the timescale and occasionally kills the design: deemed consent under the 2007 Regulations, or express council consent. Listed buildings and conservation areas change it entirely. Sign makers quote.

Cost driverWhy it moves the priceWhat to ask for
Sign constructionA flat printed panel, a built-up letter set and a fabricated illuminated tray are different manufacturing jobs, not different finishes on one job.The construction named on the quote: substrate, letter build, return depth and fixing method.
Size and the frontage it sits onMaterial scales with area, but so does the structure behind it and the number of installers needed to lift it.Dimensions in millimetres on a drawing, not a description.
Illumination methodHalo lit, face lit, internally lit tray and external trough lighting each carry different components, different labour and different maintenance.The lighting method by name, the expected lamp or LED life, and how it is accessed for repair.
Electrical supply and connectionAn illuminated sign needs a supply, an isolator and a competent electrician. If the supply is not already at the fascia, that is a separate trade and a separate bill.Whether the quote includes the electrical connection and certification, or assumes a live supply is waiting.
Installation accessA ground floor fascia over an empty pavement is a ladder job. The same sign at first floor over a busy street can need a tower, a cherry picker, a pavement licence or night working.The access method assumed, and who obtains and pays for any licence or road closure.
Fixing into the buildingFixing into modern blockwork is routine. Fixing into soft historic brick, stone or a period timber fascia is careful, slow work, and on a listed building it is a conservation decision.A survey of the fascia before quoting, and the fixing detail in writing for period or listed frontages.
Advertisement consentSigns that fall inside a deemed consent class need no application. Signs outside it need express consent, which is an application, a fee and a wait. Illuminated signs lose deemed consent entirely in conservation areas, National Parks, the Broads and Areas of Outstanding Natural Beauty.Which class the design falls into, or a clear statement that express consent is needed and who is applying.
Listed building consentSeparate from advertisement consent, and separate again from planning permission. It looks at the effect on the building's special interest, and it can change the design as well as the timeline.Confirmation of whether listed building consent is needed and who is responsible for obtaining it.
Removal and making goodTaking the old sign down, disposing of it and making good the fascia is real work and is often quietly excluded.Removal, disposal and making good priced as named lines.
Warranty and maintenanceLED failures and water ingress are the two things that go wrong. What is covered, and who climbs up to fix it, is where two similar prices diverge.The warranty period, what it excludes, and whether labour and access are included in a callout.
Shopfront Sign Price Index: every published price, with its source
How these figures were put together

Every line that moves a signage quote, why it moves it, and the thing to ask for so two quotes can be compared. Consent is in here because it is a cost and a timescale, not a formality.

This is a cost-driver table, not a price list. It does not price shop signs, because the same brief produces wildly different quotes depending on construction, illumination method, access equipment and whether the building is listed or in a conservation area, and a single range would mislead more people than it helped; the starting prices sign makers publish are in our price index. Each row names a driver, explains why it moves the money, and gives the question that makes quotes comparable. The consent rows are grounded in the Town and Country Planning (Control of Advertisements) (England) Regulations 2007 and the government's planning practice guidance, cited in full in our consent guide.

Three steps

  1. Tell us the sign type, the building and the frontage width. Two minutes, no account.

  2. We pass your details to sign makers and installers covering your postcode, and to no one else.

  3. They quote your actual shopfront, including installation. Compare, choose, or walk away.

Shop Sign Cost is a free introduction service; we pass your details to relevant local sign makers and installers, who quote you directly. We may receive a fee from providers; you pay nothing and are under no obligation. We are not affiliated with any local planning authority or government body, and nothing here is legal or planning advice. The advertisement consent rules described are those in force in England; Scotland, Wales and Northern Ireland have their own regimes, and you should check your council's position before committing to a design.

Sources

This site's own datasets, every figure quoted from its source and dated:

  • The Advertisement Consent Rules carries 4 published figures read from 4 sources' own pages, from 174 to 357 GBP, read 7 November 2026.
  • The Shopfront Sign Price Index carries 33 published figures read from 22 sources' own pages; the 20 published figures given by sign type run from 4.86 to 2,995 GBP, read 11 November 2026.
  1. gov.uk planning practice guidance, advertisements
  2. The Town and Country Planning (Control of Advertisements) (England) Regulations 2007
  3. Schedule 3, classes of advertisement for which deemed consent is granted
  4. Town and Country Planning Act 1990, section 224 (offences)
  5. gov.uk planning practice guidance, conserving and enhancing the historic environment
Get shop sign quotes